Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Exterior/Interior Clips/Sheathing/Framing
| Date |
Description |
Inspector |
Results |
Comments |
| 04/25/2025 |
COT - RSBU - Exterior/Interior Clips/Sheathing/Framing |
|
Re-inspection required |
Need access to the site. 4/25/2025 |
| 04/29/2025 |
COT - RSBU - Exterior/Interior Clips/Sheathing/Framing |
|
Re-inspection required |
4-29-25, anchor bolts are required within 12" of a splice on each side, tighten down anchor bolts at interior walls, add nails to exterior sheathing where over-penetrated nails exist (nails shall be flush with sheathing and shall not over-penetrate more than 1/16th of an inch). Add nails to loose roof panels, approved plans and truss calculations are required to be on site. STOPPED INSPECTION-ADDITIONAL ITEMS MAY BE NOTED. |
| 07/09/2025 |
COT - RSBU - Exterior/Interior Clips/Sheathing/Framing |
|
Passed |
Ok to,cover exterior walls. |