Inspection History Details
Inspection Status: Passed
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/26/2024 | BULD - Electrical Clearance | Passed | Approved 60A meter collar, DGL Clearance was called into TEP Solar was competed under separate permit |
|
| 05/22/2024 | BULD - Electrical Clearance | Passed | Approved solar installation with meter collar (line-side corrections addressed) - DGC/DGL Clearance is required for the solar meter |