Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Parcel: 13208121A


Addresses:

2307 E PARKSIDE DR


Inspection Status: Not Ready

Inspection History: BULD - Electrical Clearance

Permit Number - TC-RES-0324-01664

Inspection Description - BULD - Electrical Clearance

Inspection Status - Not Ready

Date Description Inspector Results Comments
05/03/2024 BULD - Electrical Clearance Not Ready NR, issues with the meter adapter
05/14/2024 BULD - Electrical Clearance Partial Pass Partial for the 60A meter adapter, DGL Clearance was called into TEP at 11:25am
Pending solar
06/13/2024 BULD - Electrical Clearance Passed Approved - DGC Clearance to TEP is required for the solar meter