Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: TC-RES-0324-01508

Parcel: 126131180


Addresses:

4620 E 14TH ST

Inspection Status: Not Ready

Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Date Description Inspector Results Comments
02/26/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Not Ready 2-26-25, not ready
04/16/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Partial Pass Interior plumbing only.
08/08/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required 8/8/25
Mechanical intermediate;
1. Mechanical layout is missing ductwork size; diffusers size for supply and return air registers.
2. Missing proper load calculations for HVAC.
3. Flex duct throughout is restricted due to truss layout and or straps are too tight.
4. HVAC must be designed per Manual J.
10/06/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Not Ready 1-Provide combustion air for furnaces.
2-Water heater is not per plans.
3- Fireplace is not installed.
4-Fire block per Code.
5-Grounding Electrode Conductor is spliced with a split bolt.
6-Smoke detectors are too low.
Inspection stopped; more corrections may be noted next visit.
If inspection does not pass on next visit; a re-inspection fee will be assessed.
10/07/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Canceled
10/07/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Canceled
10/08/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Partial Pass 10/8/2025 partial pass. MEP'S approved. Pending fire place. Okay to proceed progress areas.