Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/14/2024 | BULD - Electrical Clearance | Partial Pass | Partial for the Tesla meter relay to battery, DGL Clearance was called into TEP Pending solar and battery |
|
| 06/20/2024 | BULD - Electrical Clearance | Passed | Approved solar with battery, DGC / BAT Clearance to TEP is required for the solar meter and battery installation |