Permit: TC-RES-0324-01452

Parcel: 138080190


Addresses:

757 W CALLE ANTONIA

Inspection Status: Not Ready

Inspection History: RSBU - Building Final 

Date Description Inspector Results Comments
01/03/2025 RSBU - Building Final  Not Ready 01/03/2025
All lumber must be weather treated.
Beam B1 at southeast corner needs to be 4X10 and requires LU hangers at joist.
Beam B1 running north to south was cut too short on southeast end, it needs to overhang by 1'6'' per plan.
01/03/2025 RSBU - Building Final  Not Ready 12-27-24, canceled per permit holder.


01/03/2025
All lumber must be weather treated.
1/3/25: plans call for APT4 straps to be installed at beam to post connection (128T straps installed and must be replaced with APT4, 128T connectors are not load rated), B-1 required at south east corner from porch to home with appropriate hangers at 2x8 joist. Hangers missing throughout. Appropriate load rated connectors must be installed.
05/20/2025 RSBU - Building Final  Re-inspection required 5/20/2025 per previous notes. Provide proper fasteners to ledger attached to west wall. Nails have been bent trying to penetrate block wall. Remove drywall screws from Lu hanger at ridge point. Third post at east end loose from floor attachments.
12/27/2024 RSBU - Building Final  Canceled 12-27-24, canceled per permit holder.