Inspection Status: Partial Pass

Inspection History: BULD - Electrical Clearance

Date Description Inspector Results Comments
04/29/2024 BULD - Electrical Clearance Partial Pass PARTIAL PASS for MSA with DGL.
10/02/2024 BULD - Electrical Clearance Partial Pass Partial for the 60A meter adapter - DGL Clearance was called into TEP at 10:30am
Pending solar
10/17/2024 BULD - Electrical Clearance Passed Approved - DGC Clearance to TEP is required for the solar meter