Inspection Status: Re-inspection required
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/13/2025 | BULD - Electrical Clearance | Re-inspection required | Not ready. G.E.C not per code. 5/13/2025 | |
| 05/14/2025 | BULD - Electrical Clearance | Partial Pass | Approved 400A service panel upgrade - INCR Clearance to TEP is required for the cutover Pending solar approval |
|
| 05/22/2025 | BULD - Electrical Clearance | Not Ready | ||
| 06/17/2025 | BULD - Electrical Clearance | Passed | Approved solar - DGC Clearance to TEP is required for the solar meter |