Inspection History Details
Inspection Status: Passed
Inspection History: COT - RSPL - Plumbing Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/02/2024 | COT - RSPL - Plumbing Final | Passed | Call Paula 30 minutes ahead. 520-360-0218 | |
| 08/30/2023 | COT - RSPL - Plumbing Final | Re-inspection required | Not ready. Called left a voicemail. Showed up to the site and no answer. Need access to site. 8/22/2023 8/30/23: secure NMC to mini-splits, label all breakers in all panels area specific, remove sub-panel from closet and install per plan or get a revision approved by COT, install light at egress door. This residential addition was not build per plan. |