Inspection History Details
Inspection Status: Passed
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/02/2023 | BULD - Electrical Clearance | Passed | Approved for service upgrade, INCR Clearance to TEP is required for the construction power **Separate permit required for fire damage repairs** |
|
| 08/08/2023 | BULD - Electrical Clearance | Passed | INCR Clearance for temporary construction power |