Inspection Status: Passed
Inspection History: COT - RSBU - Preslab
| Date |
Description |
Inspector |
Results |
Comments |
| 01/04/2024 |
COT - RSBU - Preslab |
|
Passed |
|
| 11/14/2023 |
COT - RSBU - Preslab |
|
Re-inspection required |
11/14/23: plumbing cannot run parallel in side of footing, pex line must be 12 inches below grade, all plumbing exposed to concrete must have insulation wrap |
|
COT - RSBU - Preslab |
|
Re-inspection required |
11/16/23:plumbing/ conduit cannot run parallel in side of footing |
| 11/20/2023 |
COT - RSBU - Preslab |
|
Passed |
|