Inspection History Details
Inspection Status: Re-inspection required
Inspection History: Pool/Spa - Electric
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/06/2023 | Pool/Spa - Electric | Re-inspection required | main breaker panel locked, no detail on plans for electrical | |
| 07/27/2023 | Pool/Spa - Electric | Passed |