Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Inspection Status: Re-inspection required

Inspection History: RSBU - Building Final 

Date Description Inspector Results Comments
01/29/2026 RSBU - Building Final  Re-inspection required Dishwasher tie in incomplete. Provide hammer arrestor at hot line. Refrigerator calls to be on dedicated circuit. Tied into counter recep next to it. Insulate hot water line at water heater. Provide elbow at exterior line. Same notes for both units. Provide ladder access for roof top units. Ensure to call in engineer final prior to building final. 1/29/2026
02/06/2026 RSBU - Building Final  Passed