Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/27/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Partial Pass | 6-27-25: intermediates previously inspected and approved. Per customer, an electrical plan was uploaded to the city today for review. The plan outlines GFCI receptacles added to the bathroom. This plan must be approved prior to moving forward with another inspection. | |
| 06/27/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 6-27-25: intermediates previously inspected and approved. | |
| 09/11/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Not Ready | 9/11/24: not ready needed inspections added to list. | |
| 10/11/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 9/11/24: not ready needed inspections added to list. 10/11/24: mechanical not ready, revised set of plans required for changes in electrical work, NM cables must be secured 12" from box, NM cable sheathing must penetrate box 1/2", transition glue from ABS to PVC not allowed at VTR please use approved listed adapter. Seal all penetrations through top plate. |
|
| 10/21/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed |