Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: TC-RES-0323-03354

Parcel: 123052350


Addresses:

2020 N NORTON AV

Inspection Status: Partial Pass

Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Date Description Inspector Results Comments
06/27/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Partial Pass 6-27-25: intermediates previously inspected and approved. Per customer, an electrical plan was uploaded to the city today for review. The plan outlines GFCI receptacles added to the bathroom. This plan must be approved prior to moving forward with another inspection.
06/27/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 6-27-25: intermediates previously inspected and approved.
09/11/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Not Ready 9/11/24: not ready needed inspections added to list.
10/11/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required 9/11/24: not ready needed inspections added to list.
10/11/24: mechanical not ready, revised set of plans required for changes in electrical work, NM cables must be secured 12" from box, NM cable sheathing must penetrate box 1/2", transition glue from ABS to PVC not allowed at VTR please use approved listed adapter. Seal all penetrations through top plate.
10/21/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed