Inspection Status: Not Ready
Inspection History: RSBU - Building Final
| Date |
Description |
Inspector |
Results |
Comments |
| 03/06/2026 |
RSBU - Building Final |
|
Not Ready |
Seal off all exterior penetrations. Insulate water lines that are not within the thermal envelope throughout. Secure pex in place at multiple locations. 3/6/2026 |
| 03/10/2026 |
RSBU - Building Final |
|
Failed |
|