Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSPL - Rough Soil
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/13/2026 | COT - RSPL - Rough Soil | Re-inspection required | 3-13-26: depth at for line approved, verified gas line under test together with proper taping of joints and riser. However, a yellow tracer is required. Please reschedule. | |
| 03/23/2026 | COT - RSPL - Rough Soil | Not Ready | 03/23/2026 Verified yellow tracer wire replaced from green. Ok to backfill with shading. |