Inspection History Details
Inspection Status: Re-inspection required
Inspection History: RSBU - Building Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/17/2026 | RSBU - Building Final | Re-inspection required | 2/17/26: gas piping is currently running through notched eave/ rafter tails (structural members may not be notched or bored to accommodate gas piping unless specifically engineered), engineer fix required for notches made at structural members, gas piping must be properly supported per IFGC 415.1 support of piping, gas piping must be grounded/bonded. | |
| 02/24/2026 | RSBU - Building Final | Partial Pass | Pre-slab inspection for laundry room. Ensure slab area is termite tested. | |
| 03/11/2026 | RSBU - Building Final | Not Ready | 3-11-26: not ready for building final. | |
| 07/07/2026 | RSBU - Building Final | Passed | 07/07/2026 Corrections made to prior inspection, footing was verified and revision submitted. |