Inspection History Details
Inspection Status: Re-inspection required
Inspection History: RSBU - Building Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/24/2026 | RSBU - Building Final | Re-inspection required | Insulate hot water lines from water heater. Secure loose pex lines throughout. 2/24/2026 | |
| 02/26/2026 | RSBU - Building Final | Passed | 2/26/2026 Corrections made to prior inspection. |