Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Inspection Status: Re-inspection required

Inspection History: COT - RSPL - Plumbing Final 

Date Description Inspector Results Comments
07/16/2026 COT - RSPL - Plumbing Final  Re-inspection required 07/16/2026
T&P valve copper discharge pipe must be gravity drained down, current configuration slopes upward before terminating outdoors (2024 IRC P2804.6.1). Please paint exposed plastic pipes outdoors.
08/28/2026 COT - RSPL - Plumbing Final  Passed 08/28/2026
Corrections made.