Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSPL - Plumbing FinalĀ
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/16/2026 | COT - RSPL - Plumbing FinalĀ | Re-inspection required | 07/16/2026 T&P valve copper discharge pipe must be gravity drained down, current configuration slopes upward before terminating outdoors (2024 IRC P2804.6.1). Please paint exposed plastic pipes outdoors. |