Inspection History Details
Inspection Status: Re-inspection required
Inspection History: Pool/Spa - Bonding Grip
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/15/2025 | Pool/Spa - Bonding Grip | Re-inspection required | 15 April 25 1. Electrical niche not per plan; requires (4) # 3 diagonals. 2. Bond/grounding connections are not complete on south end of pool. |
|
| 04/17/2025 | Pool/Spa - Bonding Grip | Passed |