Inspection Status: Passed
Inspection History: BULD - Electrical Clearance
| Date |
Description |
Inspector |
Results |
Comments |
| 05/02/2025 |
BULD - Electrical Clearance |
|
Passed |
Clearance for TEP DGC/BAT. 5/2/2025 |
| 05/29/2025 |
BULD - Electrical Clearance |
|
Passed |
Partial approval for the Tesla meter adapter, DGL Clearance was called into TEP - Pending solar |
| 06/26/2025 |
BULD - Electrical Clearance |
|
Passed |
Previously approved 5/2/25 and 5/29/25 - DGC/DGL/BAT clearance to TEP is required |