Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/30/2025 | BULD - Electrical Clearance | Partial Pass | Partial for the line-side tap - DGL Clearance was called into TEP at 10:00 am Pending solar final |
|
| 08/01/2025 | BULD - Electrical Clearance | Canceled | CA, no access to disconnect by TEP | |
| 08/07/2025 | BULD - Electrical Clearance | Passed | 8.7.2025 Clearance to TEP DGC/BAT. |