Inspection Status: Partial Pass

Inspection History: COT - RSPL - Rough Soil 

Date Description Inspector Results Comments
05/29/2025 COT - RSPL - Rough Soil  Partial Pass Partial pass. Sewer tie in approved. Tracer wire in place. Okay to backfill progress areas. Shading is required. Pending grey water installation. Abs lines need to be a minimum of 12" depth to the top of the pipe. 5/29/2025
06/10/2025 COT - RSPL - Rough Soil  Passed