Inspection Status: Partial Pass
Inspection History: COT - RSPL - Rough Soil
| Date |
Description |
Inspector |
Results |
Comments |
| 05/29/2025 |
COT - RSPL - Rough Soil |
|
Partial Pass |
Partial pass. Sewer tie in approved. Tracer wire in place. Okay to backfill progress areas. Shading is required. Pending grey water installation. Abs lines need to be a minimum of 12" depth to the top of the pipe. 5/29/2025 |
| 06/10/2025 |
COT - RSPL - Rough Soil |
|
Passed |
|