Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSOL - Electrical Final Solar Project
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/31/2025 | COT - RSOL - Electrical Final Solar Project | Re-inspection required | NR, 60A disconnect shown on plans, 30A was installed. All other parts of the installation are okay | |
| 08/27/2025 | COT - RSOL - Electrical Final Solar Project | Passed | 8.27.25 PV system is installed according to plans APPROVED |