Inspection History Details
Inspection Status: Passed
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/13/2025 | BULD - Electrical Clearance | Passed | Clearance for TEP DGC. 5/13/2025 | |
| 09/17/2025 | BULD - Electrical Clearance | Partial Pass | Partial for the 60A meter adapter - DGL Clearance was called into TEP at 11:30am Pending solar final |
|
| 10/21/2025 | BULD - Electrical Clearance | Passed | DGL code |