Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/28/2025 | BULD - Electrical Clearance | Partial Pass | Partial for the Tesla meter adapter- DGL Clearance was called into TEP at 11:00am Pending solar |
|
| 06/30/2025 | BULD - Electrical Clearance | Passed | 6.30.25 PV system installed per plans. Proper conductors verified Lugs torqued to spec. Grounding verified. Neutrals marked. Labels on conduits and equipment faces verified. |