Inspection History Details
Inspection Status: Passed
Inspection History: RSBU - Building FinalĀ
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/30/2025 | RSBU - Building FinalĀ | Passed | 6.30.25 PV system installed per plans. Proper conductors verified Lugs torqued to spec. Grounding verified. Neutrals marked. Labels on conduits and equipment faces verified. |