Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - RSEL - Electrical Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/13/2025 | COT - RSEL - Electrical Final | Not Ready | 5-13-25, not ready for gas reconnect/final & building final. See approved for details-all utilities must be disconnected/secured, RV's removed, yard cleaned, etc..and inspected before permit can be closed. Note: all utilities have not been disconnected at time of inspection. |
|
| 05/21/2025 | COT - RSEL - Electrical Final | Re-inspection required | 5-13-25, not ready for electrical clearance. 5/21/25 1. Blank cover needed over exposed breaker. 2. Improper grounding, need 2 stakes dug 8ft long into earth 6 ft apart. 3. Missing metal address label on the panel. |
|
| 05/29/2025 | COT - RSEL - Electrical Final | Re-inspection required | 5/29/2025 Final inspection requires a hot check to all receptacles and panel labeling. | |
| 06/25/2025 | COT - RSEL - Electrical Final | Passed |