Inspection History Details
Inspection Status: Re-inspection required
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/13/2025 | BULD - Electrical Clearance | Re-inspection required | 5-13-25, not ready for electrical clearance. | |
| 05/21/2025 | BULD - Electrical Clearance | Re-inspection required | 5-13-25, not ready for electrical clearance. 5/21/25 1. Blank cover needed over exposed breaker. 2. Improper grounding, need 2 stakes dug 8ft long into earth 6 ft apart. 3. Missing metal address label on the panel. |
|
| 05/29/2025 | BULD - Electrical Clearance | Passed | 5/29/2025 clearance for TEP RECN. |