Inspection History Details
Inspection Status: Canceled
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/23/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Canceled | ||
| 03/31/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 3.31.26 All physical corrections have been made. Only remaining item is a letter of responsibility from contractor who did the work to the property. |
|
| 11/04/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 11.04.2025 Follow construction plans to add missing trusses and hold downs at back carport and side carport, add column per plan at back porch and expose one footing to verify depth. Missing receptacles throughout interior rooms and exhaust fan in laundry and GFCI outlets needed in laundry. Upload letter from construction company to TDC online portal stating responsibility of construction and construction meets 2018 IRC building codes. |