Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSME - Mechanical Final
Permit Number - TC-RES-0224-01071
Inspection Description - COT - RSME - Mechanical Final
Inspection Status - Re-inspection required
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/26/2024 | COT - RSME - Mechanical Final | Re-inspection required | 6/7/24: not ready 6/26/24: water hammer arrestor must be accessible, missing water hammer at hot water at laundry box, sediment trap missing at water heater, T&P must terminate to exterior of building, receptacles missing at laundry room, rain cap and storm collar missing at water heater vent, seal all penetrations through top plate, seal all penetrations through vapor barrier, properly secure wiring in wall. Gas piping must be grounded |
|
07/01/2024 | COT - RSME - Mechanical Final | Re-inspection required | 6/7/24: not ready 6/26/24: water hammer arrestor must be accessible, missing water hammer at hot water at laundry box, sediment trap missing at water heater, T&P must terminate to exterior of building, receptacles missing at laundry room, rain cap and storm collar missing at water heater vent, seal all penetrations through top plate, seal all penetrations through vapor barrier, properly secure wiring in wall. Gas piping must be grounded 7/1/24: dishwasher drain must be properly supported, T&P Drain must terminate 6" above grade and be UV coated, sediment trap at water heater not properly installed, secure electrical cables 12" from main panel, seal penetrations through top plate, seal penetration through vapor barrier, use proper adhesive at CPVC, combustion air required at laundry room, |
|
07/18/2024 | COT - RSME - Mechanical Final | Passed |