Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSPL - Plumbing Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/16/2026 | COT - RSPL - Plumbing Final | Re-inspection required | 4/16/26 1. Provide two receptacles in the kitchen 24 inches from each side of the stove. 2. Provide water hammer arresters at laundry, dishwasher and ice-maker. 3. Toilet in Master bedroom is too close to shower. Needs to be 15 inches away measured to center flange from outside edge of shower curb. 4. Provide inspection windows to see repairs done to walls and ceiling. 5. Vent water heater and provide T/P relief pipe . 6. Make sure all smoke detectors are woking properly. 7. Add dishwasher and high loop on dishwasher. 8. Add range with anti-tip bracket. 9. Main service panel have multiple knockouts the need to be sealed. There is also, an opening inside the dead front that must be capped. |
|
| 09/03/2026 | COT - RSPL - Plumbing Final | Re-inspection required | 8.3.26 1. Water heater vent too low 2. Still missing water hammer at dishwasher 3. Receptacle behind kitchen sink needs to be GFCI, please make this s separate circuit in order to meet code for 2 small appliance circuit. FOR UNPERMITTED WORK THAT IS ALREADY COVERED UP: Please provide pictures of work behind drywalls, to verify sill plate, anchor bolts and studs. Or open sections of wall large enough to inspect work. |
|
| 09/08/2026 | COT - RSPL - Plumbing Final | Passed | 9.8.26 All corrections made. ADU was not part of scope and not inspected. |