Inspection Status: Not Ready
Inspection History: COT - RSBU - Excavation/Rebar/Zoning
| Date |
Description |
Inspector |
Results |
Comments |
| 06/10/2025 |
COT - RSBU - Excavation/Rebar/Zoning |
|
Not Ready |
|
| 07/09/2025 |
COT - RSBU - Excavation/Rebar/Zoning |
|
Not Ready |
Called multiple times left voicemail. Need access to the site. 7/9/2025 |
| 07/15/2025 |
COT - RSBU - Excavation/Rebar/Zoning |
|
Re-inspection required |
7.15.24 footings not excavated fully. Loose material throughout footing perimeter. Plumbing pipes not wrapped. Rebar not per plan. |
| 07/22/2025 |
COT - RSBU - Excavation/Rebar/Zoning |
|
Re-inspection required |
Satisfactory changes still not mad4. Site is not per plan. 7.22.25 |
| 07/29/2025 |
COT - RSBU - Excavation/Rebar/Zoning |
|
Partial Pass |
|
| 11/25/2025 |
COT - RSBU - Excavation/Rebar/Zoning |
|
Passed |
|