Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Re-inspection required
Inspection History: COT - RSPL - Rough Soil
| Date |
Description |
Inspector |
Results |
Comments |
| 06/08/2023 |
COT - RSPL - Rough Soil |
|
Re-inspection required |
6/8/23: install min 5foot water column, some pipes are air vapor locked. |
| 06/09/2023 |
COT - RSPL - Rough Soil |
|
Passed |
6-9-23: Plumbers have installed water column at 5', all underground plumbing is under water test. Okay to backfill trenches and prepare for subsoil compaction. |