Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - RSPL - Plumbing Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/31/2024 | COT - RSPL - Plumbing Final | Not Ready | 1/31/24: extension request | |
| 03/12/2025 | COT - RSPL - Plumbing Final | Canceled | ||
| 05/30/2025 | COT - RSPL - Plumbing Final | Re-inspection required | 5-30-25: missing "knockout"at subpanel, label breakers at panel, exterior receptacles must be weather resistant, paint/seal all exterior wood together with condensation line at rooftop, firefoam all penetrations at top plates inside storage structure, install light fixture at storage or cap where no exposed wires are visible, insulate hose bib and wrap with 10 mil tape, install vacuum breaker at hose bib, cut cleanout to grade, seal bathroom water closet, missing receptacle covers on back bedroom together with a smoke detector.Stopped inspection-a reinspection is required and additional items may be added. | |
| 06/10/2024 | COT - RSPL - Plumbing Final | Not Ready | 1/31/24: extension request 6/10/24: permit extension |
|
| 08/18/2025 | COT - RSPL - Plumbing Final | Passed | 8.18.25 Satisfactory corrections implemented Passed |