Permit: TC-RES-0223-02992

Parcel: 129024070


Addresses:

2902 E MALVERN ST

Inspection Status: Passed

Inspection History: COT - RSBU - Excavation/Rebar/Zoning 

Date Description Inspector Results Comments
04/02/2024 COT - RSBU - Excavation/Rebar/Zoning  Passed
10/04/2023 COT - RSBU - Excavation/Rebar/Zoning  Partial Pass Rebar reinforcement is properly installed in footings, and for concrete slab. Sub-soil is properly compacted. Okay to pour concrete for footings and slab. Concrete for porch slab and column footing will be poured at a later date.
11/03/2023 COT - RSBU - Excavation/Rebar/Zoning  Partial Pass Rebar reinforcement is properly installed in footings, and for concrete slab. Sub-soil is properly compacted. Okay to pour concrete for footings and slab. Concrete for porch slab and column footing will be poured at a later date.
11/3/23: reinforcement at new porch footing per schedule ok to pour.