Permit: TC-RES-0223-02946

Parcel: 136203560


Addresses:

3710 S MANITOBA AV

Inspection Status: Re-inspection required

Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Date Description Inspector Results Comments
11/14/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required Not ready loose fitting at pex line in bathroom near garage. Tubs are empty. Fire foam top penetrations. Add nail plates to anything less than 1"1/4. To S TRAPS have been created in the laundry area. Need a 4" spacing between elbows. Provide DWV TEST. Hallway at final needs to be at 36". Smoke detectors 6" from walls. Too many issues. STOPPED INSPECTION. 11/14/2023
11/20/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required 11/20/23: 1,load the roof. 2, approved plans not on site. 3, remove all trash/construction debris from site. 4, hallway framing will not result in a minimum 36" finish wall. 5, block all over-cut openings in the OSB shear wall. 6, support both ends of 4-gang elect boxes. 7, outlets are required on the wall within 6 feet of door opening. 8, fresh air intake is within 10 feet of a vent
11/30/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required (with fee) 11/30/23: fire foam top plate penetration for condenser line
12/05/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required 12/5/23: bearing wall studs on north wall over-notched, block all large openings in OSB shear wall with 2x4, construction debris is still not contained, block register boxes in great room, support flex duct every 4 feet per manufactures specs( can not be supported by trusses or any other trades, fire block top of the 2 chases going into master bedroom
12/22/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed