Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date |
Description |
Inspector |
Results |
Comments |
| 11/14/2023 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required |
Not ready loose fitting at pex line in bathroom near garage. Tubs are empty. Fire foam top penetrations. Add nail plates to anything less than 1"1/4. To S TRAPS have been created in the laundry area. Need a 4" spacing between elbows. Provide DWV TEST. Hallway at final needs to be at 36". Smoke detectors 6" from walls. Too many issues. STOPPED INSPECTION. 11/14/2023 |
| 11/20/2023 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required |
11/20/23: 1,load the roof. 2, approved plans not on site. 3, remove all trash/construction debris from site. 4, hallway framing will not result in a minimum 36" finish wall. 5, block all over-cut openings in the OSB shear wall. 6, support both ends of 4-gang elect boxes. 7, outlets are required on the wall within 6 feet of door opening. 8, fresh air intake is within 10 feet of a vent |
| 11/30/2023 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required (with fee) |
11/30/23: fire foam top plate penetration for condenser line |
| 12/05/2023 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required |
12/5/23: bearing wall studs on north wall over-notched, block all large openings in OSB shear wall with 2x4, construction debris is still not contained, block register boxes in great room, support flex duct every 4 feet per manufactures specs( can not be supported by trusses or any other trades, fire block top of the 2 chases going into master bedroom |
| 12/22/2023 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Passed |
|