Inspection History Details
Inspection Status: Re-inspection required
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/07/2023 | BULD - Electrical Clearance | Re-inspection required | 9/7/23: Not ready needs to bond water and gas | |
| 09/11/2023 | BULD - Electrical Clearance | Passed |