Inspection Status: Passed
Inspection History: COT - RSPL - Rough Soil
| Date |
Description |
Inspector |
Results |
Comments |
| 05/08/2024 |
COT - RSPL - Rough Soil |
|
Passed |
|
| 06/23/2023 |
COT - RSPL - Rough Soil |
|
Not Ready |
6/23/23: not ready |
| 06/23/2023 |
COT - RSPL - Rough Soil |
|
Not Ready |
6/23/23: not ready |
| 07/07/2023 |
COT - RSPL - Rough Soil |
|
Passed |
7-7-23: Connection to the main sewer line has not been completed. Piping from inside of house is complete to 5' outside exterior wall. Contractor needs to dig and expose more of the main line to get a more solid piece of clay pipe to connect to the house. Okay to backfill trenches and replace concrete slab. |