Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: BULD - Electrical Clearance
| Date |
Description |
Inspector |
Results |
Comments |
| 05/08/2024 |
BULD - Electrical Clearance |
|
Passed |
|
| 06/23/2023 |
BULD - Electrical Clearance |
|
Re-inspection required |
6/23/23: new panel is not grounded. Install 2 ground rods 6 feet apart and instal a GEC (#4 CU) to the panel. Not ready for inspection. |
| 06/23/2023 |
BULD - Electrical Clearance |
|
Re-inspection required |
6/23/23: new panel is not grounded. Install 2 ground rods 6 feet apart and instal a GEC (#4 CU) to the panel. Not ready for inspection. |
| 11/02/2023 |
BULD - Electrical Clearance |
|
Passed |
Pass INCR called TEP at 10:04am Natalie |