Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date |
Description |
Inspector |
Results |
Comments |
| 07/23/2024 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required |
7/23/24: Fire Blocking (R302.11) required at both north and south walls between storage and sleeping quarters, seal all penetrations through sleeping quarters into storage, all metallic boxes must be grounded, seal all penetrations through vapor barrier, seal all penetrations through top plate, properly protect all wiring running in ICF, water heater not roughed-in, DWV not under test, support DWV midway in wall, clean-outs missing throughout, properly support wiring throughout, properly insulate hot water lines. Primer not used at PVC for mini split condensate drain, STOPPED INSPECTION MORE ITEMS MAY BE ADDED. |
| 07/25/2024 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Passed |
OK to insulate and cover walls |