Inspection History Details
Inspection Status: Canceled
Inspection History: COT - RSEL - Electrical Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/30/2026 | COT - RSEL - Electrical Final | Canceled | 01/30/2026 Canceled per contractor. |
|
| 02/04/2026 | COT - RSEL - Electrical Final | Passed | 02/04/2026 Clearance TEP DGC. Repaired damaged disconnect and meter socket to existing PV system. |