Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - RSPL - Rough Soil
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/16/2025 | COT - RSPL - Rough Soil | Partial Pass | 9/15/25: Partial pass for sewer tie-in from ADU to sewer connection. Pending ADU Rough-soil inspection. | |
| 09/17/2025 | COT - RSPL - Rough Soil | Re-inspection required | 9.17.25 Plumbing cannot run parallel in footer |
|
| 09/19/2025 | COT - RSPL - Rough Soil | Re-inspection required | 9.19.25 Same issues as previously noted next reinspect will require re fee |
|
| 09/24/2025 | COT - RSPL - Rough Soil | Passed |