Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/23/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Not Ready | 1-Obtain approval of Exterior/Interior shear clips/ framing inspection before rescheduling this inspection. 2- Bedroom has no opening meeting the Emergency Escape/Rescue opening requirements of the IRC. 3- Ufer connection is missing. 4- Ufer connection access panel is missing. 5- AC compressor location has moved from what is shown on plans, to an area with questionable clearance; verify that adequate clearance will be provided for compressor. 6-DWV piping is not under test. Inspection stopped; more corrections may be given next visit. |
|
| 09/24/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 9.24.25 Corrections remain unattended |
|
| 09/29/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed |