Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Excavation/Rebar/Zoning
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/23/2025 | COT - RSBU - Excavation/Rebar/Zoning | Re-inspection required | 7.23.25 Work completed prior to inspections being called or conducted. Need to verify footing depth by pockets 2x2 at all 4 sides, two per. Anchor bolt spacing not per plan. Window height of opening not code compliant at bedrooms. DWV not under test. Undergoing plumbing test not yet conducted. Headers not per plan. Weep screed cannot terminate over slab. Letters required for: pre slab, framing, roofing, plumbing to ensure that all construction meets or exceeds the 2018 IRC. SUBMIT CHNAGE OF ADDRESS TO PROPER UNIT (d) |
|
| 07/29/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed |