Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Excavation/Rebar/Zoning
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/10/2026 | COT - RSBU - Excavation/Rebar/Zoning | Re-inspection required | 6-10-26: add reinforcement at corners, wrap all DWV, remove loose fill from footings and compact around DWV and other areas of mat. | |
| 06/12/2026 | COT - RSBU - Excavation/Rebar/Zoning | Re-inspection required | 6.12.26. 1. Loose and collapsed footings, with dirt covering rebar or less than 3" from earth. 2. Bathroom ABS near north bathroom is partially exposed and needs to be covered with earth and ABC. 3. Footing needs to be on undisturbed earth or compacted with layer of gravel. |
|
| 06/15/2026 | COT - RSBU - Excavation/Rebar/Zoning | Passed |