Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/19/2025 | BULD - Electrical Clearance | Partial Pass | Partial pass. Verbal clearance to TEP INCR. Pending Solar. 5/19/2025 | |
| 06/17/2025 | BULD - Electrical Clearance | Partial Pass | Partial for the Tesla meter switch - DGL Clearance was called into TEP Pending solar |