Inspection History Details
Inspection Status: Passed
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/25/2025 | BULD - Electrical Clearance | Passed | DGL CLEARANCE | |
| 04/01/2025 | BULD - Electrical Clearance | Passed | Approved solar and powerwall 3 - DGC/BAT Clearance to TEP is required for the solar meter |