Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date |
Description |
Inspector |
Results |
Comments |
| 01/15/2025 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required |
Washer outlet box is less than 18 inches to trap, washer drain is an S trap needs an air admittance valve and or vent on the vertical line and connection between Santee and trap needs to be 1.5 times the diameter of the pipe minimum, please fire foam all penetrations through the top plate, several nail stops missing throughout, verified R5 insulation on top deck of roof sheathing, please use barrel cramps on grounds or five wraps on bare ground with wire nut, please ground all metal boxes and make up all grounds throughout prior to inspection |
| 01/22/2025 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Passed |
|