Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSEL - Electrical Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/16/2026 | COT - RSEL - Electrical Final | Re-inspection required | 9/16/26: NOT READY, RECEPTACLE AT KITCHEN COUNTER TOP REQUIRED 24" from edge, wiring in wall must be properly secured and protected when closer than 1 1/4" from face of stud, all penetrations through top plate shall be sealed, led wiring must be properly installed, remove all wiring that is no longer in use, wiring exposed to physical damage must be protected, sub panel has been replaced (revision required), Kitchen hood duct requires revision, mechanical work will require revision, wiring must be properly secured throughout, south end of home is on separate permit but also requires additional work prior to closing up any walls. | |
| 10/23/2026 | COT - RSEL - Electrical Final | Not Ready | 10/23/2026 Not all corrections made. Main service panel has three different type of breakers intermixed in panel. Panel schedule not completed. Kitchen breakers require AFCI protection. Below kitchen countertop has exposed Romex wire at susie-q. Oven hood has receptacle that needs to be moved or covered. Multiple GFI receptacles at countertop not properly working. Dishwasher/disposal breaker missing or not label3d properly. |